SHANTOU · GUANGDONG·China's toy manufacturing hub — manufacturer-direct wholesale

Quality & Compliance

Documents follow the SKU. Quality follows the order.

Compliance is not a badge on a homepage — it is a file path that connects one SKU, one batch and one destination market. This page shows exactly how we build that path for every order.

The four-step path

Verification before quotation, inspection before packing.

Define the SKU before it quotes.

Every reference gets a definition file: materials, age grading, battery type, packaging and the destination market it will be quoted for. No file, no quotation.

Request documents against the actual product.

Test reports and certificates scoped to the SKU, its batteries and packaging, and your market — not a factory-wide certificate that covers nothing specific.

Inspect where defects actually happen.

Incoming materials, in-line assembly, final random inspection before packing release. Checkpoints are agreed at order confirmation.

Keep the file traceable.

Quotation, sample approval, inspection results, shipment photos and documents live in one order file. When your auditor asks, the answer is a link, not a search.

Market file paths

What we request, per market.

MarketCommon file pathConfirm before approval
United StatesASTM F963, CPSIA, CPCTracking label, age grading, buyer requirements
European UnionEN 71 (1-2-3), CE, REACH as applicableElectrical, battery and chemical scope
United KingdomBS EN 71, UKCA route as applicableMarket labeling, importer information
Battery itemsBattery directives & transport rules per laneCell type, pack config, shipping class
Factory levelSocial-compliance evidenceNot a product safety certificate — kept separate

Three inspection levels

Where defects get caught.

Incoming material checks on toy components
Incoming — materials checked against the definition file
In-line assembly checks during toy production
In-line — function checks during assembly
Final random inspection on packed toy cartons
Final random inspection — AQL-based, before packing release

Boundaries we keep

  • No certification-logo walls — files are matched to SKU and market, shown per project
  • A factory social audit is not a product safety test; we keep the two separate in every file
  • Third-party testing arranged against the golden sample where the market requires
  • Water toys are play products — nothing in our range is positioned as safety or rescue equipment

Compliance Q&A

Do your toys have CE / EN 71 certification?

Files are requested per SKU and market, and reviewed before approval. If a reference holds current EN 71 files for your scope, we share them in the RFQ stage; if not, we say so and quote the testing path instead.

Can you supply CPC documents for the US market?

CPC is issued against a tested SKU with proper traceability. We confirm which references hold current files and what a new test would add in time and cost.

Who does the testing?

Producing-plant reports are the baseline; where the market or your program requires, we arrange third-party testing against the golden sample.

What happens if an inspection fails?

The report states the findings; rework or re-inspection is scheduled against your ship window, and you see the follow-up report — not a verbal 'it's fine.'

Can I visit or hire my own inspector?

Both are welcome. Showroom visits year-round; third-party inspections coordinated with the line schedule.

WhatsApp